Services

COMPLETION CHEMICALS / CASING CLEANING

Our philosophy;

Meet SPEC for cleanliness with fast seawater cut-off point with lowest possible effect on the environment, subsequent operations to go ahead as planned.

   
Chemicals supplied & recommended based on laboratory testing and previous experience may include: soaps, detergents, flocculants, pipe-dope removers, lubricants and oxygen scavengers.   

REMEDIAL SERVICES

Asphaltene, Wax and Scale Dissolvers
Radioactive decontamination of oilfield equipment

PRODUCTION & PROCESS CHEMICALS

Tailormade to your needs; demulsifiers, deoilers, corrosion inhibitors, scale inhibitors, asphaltene inhibitors, wax inhibitors,
wax dissolvers, asphaltene dissolvers and scale dissolvers.
     

CEMENTING ADDITIVES

Fluid Loss Additives, Dispersants, Defoamers, Spacers & Chemical Washes, and, Lubricants to ensure continuation of rotation of the liner throughout cementing, especially in extended horizontal wells.

CEMENT-LABORATORY TEST EQUIPMENT  (CTE)

Old Halliburton UCA before refurbishing

The same UCA after refurbishing by CTE.  Imagine getting a like- new instrument for a fraction of the cost of a new one.

 

One of our specialties is rebuilding old consistometers. As the photos below show, we can turn an old consistometer into a like new consistometer for only a fraction of the cost of a new instrument.

 

 

The above photos show a consistometer before we rebuilt it. It apparently had been sitting outside for some period of time.

 

This photo shows the consistometer after being rebuilt by CTE. Imagine what we can do for your old machine!

 

   



OIL SPILL ABSORBENT

"Oilsorb" absorbs oil - not water.

 



RX-72TL  BRINE LUBRICANT / FRICTION REDUCER
"Multifunctional Additive"

Stat. A-35AT2; 2 3/8” CT1000 inside 7”monobore

 

Utilised in a variety of APPLICATIONS to reduce metal / metal friction:

Completions     Casing Cleaning;  continuous rotation of DP
Running of completion equipment.

 

Snubbing rotate your snubbing string in long horizontal wells (longest horizontal section =7200m, reduction in torque at TD = 43%)

 
Coil-Tubing further access to deep / extended wells (40 % reduction in friction achieved!)

 
Wireline reach logging depth in deviated wells

 

Drilling reduce torque & drag

 

Milling reduce torque (ref. Aasgard, temp = 165C, 30% reduction in torque)

 
P & A retrieving your tubulars

 

Cementing rotate your liner